Schedule quality, risk & assurance · DCMA-aligned

Evaluate your schedule in minutes, not days.

Score.·Assure.·Defend.

Score any Primavera P6 or Microsoft Project schedule against 18 quality checks — the DCMA 14-point assessment plus four more, tuned to your company's own standard. Pinpoint what's dragging it down and turn it into a client-ready forensic report — all in your browser.

🔒 Parsed in your browser — your programme is never uploaded  ·  P6 .xer/.xml + MS Project .xml  ·  see a sample report →
TowerC_Programme_R12.xer · 3,842 acts
73
Schedule Quality Score
18 checks · DCMA 14+4
Logic density
88
Open ends
41
Total float
67
Critical path
84
Hard constraints
58
Negative float
92
WBS · STEEL — CRITICAL PATHJan – Jun
DATA DATE
critical driving logic
Score
18 checks (DCMA 14 + 4) weighted into a 0–100 Schedule Quality Score — tuned to your standard.
Diagnose
Drill into the exact activities failing each check, with suggested fixes.
Compare
Baseline variance & multi-revision delay trend, critical-path traced.
Defend
One-click Claim Brief — a defensible delay & entitlement narrative.
Why it's different No install No seat licences Minutes, not training days From £10 — pay per report
Across the whole schedule lifecycle

From first draft to final claim — one tool.

01 · DEVELOP
Build it clean
18 live checks & click-through drill-down catch open ends, negative float and logic gaps as you build.
02 · PRE-SUBMISSION
Check before you send
Self-review before it reaches the client — fix what's flagged and raise your Schedule Quality Score.
03 · ACCEPTANCE
Vet what you receive
Owners & PMOs grade a contractor's programme against their rule with the Submission Scorecard.
04 · FORECAST
See the risk
Monte Carlo gives P50/P80/P90 finish dates and the probability of finishing on time.
05 · DEFEND
Prove it if challenged
Change log, baseline variance and a one-click Claim Brief — every figure traced to the activities behind it.
< 10 min
Upload to graded report
18
checks · configurable
.xer / .xml
P6 & MS Project
0
files uploaded · runs in-browser
Why it matters

Expert-level rigour — on every schedule, not just disputes.

A manual DCMA review is slow, varies by who runs it, and is hard to defend when challenged. ScheduleInsight runs the identical method on every schedule and traces every figure back to the activities behind it.

Built on the DCMA 14-point assessment — extended with four extra checks and any custom criteria you add.

Manual reviewScheduleInsight
Time per cycle~2–3 daysminutes
Consistencyvaries by revieweridentical every run
Traceabilitymanual cross-checkevery figure linked
Deliverablerebuilt by handone-click report
How it works

From raw schedule to defensible report in three steps.

01
Upload your schedule
Drop a Primavera P6 (.xer / .xml) or Microsoft Project (.xml) export. Parsed in seconds — no install, no plugin.
02
Explore it free
Interactive Gantt, 18 quality checks, and a live Schedule Quality Score. Click any check to drill into the activities causing it.
03
Generate the report
One click turns the analysis into a forensic PDF with a plain-language narrative — ready to hand to a client.
The viewer · free

See the whole programme — and exactly where it's weak.

The Schedule Quality Score scores eighteen checks — the DCMA 14-point assessment plus four more — the moment you upload. Every metric is clickable — drill straight into the failing activities on an interactive P6-style Gantt. No payment to look.

Logic density, open ends, float, constraints + 10 more
Critical path traced and highlighted
Metric → failing-activity drilldown
Details · metric drill-down
Open Ends · FAIL · weight 10
Activities missing predecessor or successor logic
Open-ended tasks float free and distort the critical path.
17
failing
5%
of activities
≤5%
threshold
A1801MEP rough-in, Zone AS0
A1844Fire damper install, L5P0
A1902Ceiling grid, North wingS0
Suggested fix  Close the successor links on the MEP rough-in chain to recover both open-ends and out-of-sequence.
Across the whole schedule lifecycle

Your standard, not just DCMA — score, diagnose, forecast, compare and defend.

18 checks — your company standard
Score against the DCMA 14-point assessment plus four more — then make it yours: change any threshold and weight, or add your own no-code custom criteria, all rolled into one weighted 0–100 Schedule Quality Score.
🏛️
DCMA 14-point
The defence-industry 14-point framework used in forensic schedule and delay analysis, scored as its own panel — a clear pass/fail on each check, out of 14.
Submission Scorecard
A pass/fail acceptance gate for owners & PMOs vetting a contractor's programme — ACCEPT / ACCEPT WITH COMMENTS / REJECT against your own acceptance rule, downloadable as a Submission report.
🎲
Monte Carlo risk
Forecast the finish date with confidence — P50 / P80 / P90 dates, probability of finishing on time, and a criticality tornado from thousands of simulated runs.
Forensic comparison
Track exactly what changed between revisions — new and removed activities, date movement, logic changes and the critical-path delay — matched activity-by-activity in a change log.
Defensible deliverables
Turn the analysis into a client-ready PDF: a Schedule Quality report, a delay comparison, a multi-revision trend, or a one-click Claim Brief with the delay & entitlement narrative drafted for you.
Who it's for

One tool, three jobs.

👷
Contractor planners
Sanity-check your own P6 or MS Project programme before you submit — catch open ends, negative float and logic gaps, and fix them with the suggested actions.
🛡️
Owners & PMO
Vet a contractor's schedule against your acceptance rule with the Submission Scorecard — a defensible accept/reject gate and a governance trail.
⚖️
Delay & claims consultants
Build the delay story faster — multi-revision change log, baseline variance, and a one-click Claim Brief that drafts the delay & entitlement narrative for you to review and sign off.
Why you can trust the number

Transparent method. Every figure traceable.

The Schedule Quality Score isn't a black box. It's a weighted roll-up of 18 checks built on the DCMA 14-point assessment — every threshold, weight and custom rule is visible and editable, and every score drills straight down to the exact activities behind it.

See a sample report Read the methodology
Data & security

Your schedules are confidential. We treat them that way.

Programmes are often contractual and sensitive. ScheduleInsight processes your files only to produce the analysis you ask for — nothing more.

🔒
Parsed in your browser — never uploaded
Your .xer is read and scored entirely in your browser. The schedule file itself is never sent to our servers. The only thing that ever leaves your device is a report you explicitly choose to share via a link.
Your data, your control
Delete reports individually or remove your account and its data on request. Share links are revocable instantly, with optional passcode, expiry and recipient watermark.
Transparent & configurable
The Schedule Quality Score is a weighted roll-up of 18 checks (DCMA 14 + 4). Thresholds, weights and your own custom criteria are all configurable per organisation — no black box.
📄
P6 & MS Project
Reads Primavera P6 .xer / .xml and Microsoft Project .xml (File → Save As → XML) exports. No install, no plugin, no agent on your machine.
Read the Privacy Policy · Terms
Pricing

Free to explore. Pay only for the report.

Explore any schedule at no cost. Pay per report when you need a deliverable — or subscribe once the volume picks up.

ALWAYS FREE
Schedule Viewer
£0/ forever
Explore, score and diagnose any schedule.
Interactive Gantt + 18 quality checks
Live Schedule Quality Score (0–100)
On-screen Monte Carlo risk forecast
Sign up free
PAY PER REPORT
On-demand
£10per report
Generate a forensic deliverable when you need one.
Schedule Quality report from £10
Baseline Comparison from £15
Risk Forecast · Trend Analysis · Claim Brief
See all report prices →
SUBSCRIPTION
Professional
£69/ month
Unlimited analyses for consultants and firms.
Unlimited analyses, all report types
Unlimited project dashboards
Priority email support
See plan details →
FOR CLAIMS PROS
Pro+
£99/ month
Unlimited Claim Briefs and white-label reports.
Unlimited Claim Briefs (all 3 methods)
White-label — your logo on every report
Everything in Professional
See plan details →
FAQ

Common questions.

Primavera P6 (.xer and .xml) and Microsoft Project (.xml, via File → Save As → XML). Native Microsoft Project .mpp and Asta Powerproject .pp aren't read directly yet — export those to .xml or .xer first. Drop the file in and it's parsed in seconds — no install or plugin required.
No. Viewing a single schedule — the interactive Gantt, all 18 checks, and the live Schedule Quality Score — is always free. You only pay when you generate a downloadable forensic report.
Eighteen checks — the DCMA 14-point assessment plus four more (logic density, open ends, total float, negative float, hard constraints, critical-path quality, and more). The Schedule Quality Score rolls them into a single weighted score from 0–100. A score above 75 is considered healthy.
Yes — that's the point. Every check's threshold and weight is editable, and you can add your own no-code custom criteria (subject → field → operator → value), which fold straight into the Schedule Quality Score. Start from the DCMA 14 + 4 baseline and make it match how your organisation grades a schedule. Your settings are saved in your browser.
The paywall fires once: when you generate a deliverable. A single Schedule Quality report is £10, a baseline Comparison is £15, a Risk Forecast is £20, and a multi-version Trend analysis report is £40. If you run reports regularly, a Lite plan (£19 for 5/mo), Planner (£29 for 10/mo) or Professional (£69 unlimited) is cheaper.
Reports are built for scrutiny: a transparent, DCMA-aligned methodology with a plain-language narrative where every figure is traced back to the activities behind it, plus a PDF and Excel appendix you can hand straight to a client. They are analysis aids — you review and sign off before relying on them contractually.

Turn your next schedule review
into a defensible deliverable.

Create a free account, upload a P6 schedule, and see your DCMA quality score in minutes.
Sign up free See a sample report