Report examples

See every report before you buy

ScheduleInsight produces seven distinct deliverables from your Primavera P6 or Microsoft Project schedule. Browse full working examples — real-format output, fictional project data — so you know exactly what you are getting.

All report types
73 /100 14 pass 4 fail 0 warn
£10 per report
Schedule Quality report
A full 18-check DCMA assessment of your programme, scored 0–100, with a critical findings table and plain-language narrative ready to share with your client.
  • 18-check quality matrix with pass / warn / fail per check
  • Schedule Quality Score (SQS) 0–100 with benchmark context
  • Plain-language narrative suitable for senior review
  • PDF + shareable secure link
View example
ACCEPT with comments SQS 73 / min 65
Included with Quality report
Submission Scorecard
An ACCEPT / ACCEPT WITH COMMENTS / REJECT gate for programme submissions, applied against your configurable acceptance thresholds. Included at no extra cost with every Schedule Quality report.
  • Configurable SQS acceptance threshold
  • Clear ACCEPT / ACCEPT WITH COMMENTS / REJECT decision
  • Condition items listed where threshold not met
  • Downloadable submission decision record PDF
View example
Included with Quality report
Executive Brief
A one-page board-ready narrative distilled from your Schedule Quality findings. Translates technical DCMA results into plain English for project directors and steering committees.
  • Non-technical summary of quality assessment
  • Risk flags presented in plain language
  • Signed and dated for formal circulation
  • Included with every Schedule Quality report
View example
BASELINE CURRENT +73d
£15 per report
Baseline Comparison
Activity-level delay identification between a baseline and an update, with a delay waterfall, critical delay path trace, and concurrent delay assessment. Essential for claims and programme health reviews.
  • Net delay calculation and delay waterfall chart
  • Critical delay path identification per revision
  • Concurrent delay detection and quantification
  • Excel appendix with full activity-level delta
View example
P50 P80 P90 100% 0%
£20 per report
Risk Forecast
A full Monte Carlo risk forecast for your remaining programme, calibrated to your working calendar. Produces P50 / P80 / P90 finish dates, a finish-date probability distribution, a criticality tornado, and a narrative report.
  • P50 / P80 / P90 completion dates with duration ranges
  • Probability of completing by planned date
  • Criticality tornado — top risk drivers ranked
  • Working-calendar calibrated (UKCS, construction, custom)
View example
R1 R2 R3 R4 PCD −91d
£40 per report
Trend Analysis
Period-by-period delay tracking across three or more schedule revisions. Shows cumulative delay accumulation, completion-date drift, and the key periods where slippage was introduced.
  • Period-by-period delay waterfall across revisions
  • Completion-date trend chart over reporting cycles
  • Cross-update activity matching and reconciliation
  • Consolidated PDF + Excel appendix per revision
View example
TIA WA
£80 per report
Claim Brief
A 2–3 page forensic delay and entitlement narrative, produced from a completed Comparison or Trend Analysis. Applies three recognised forensic methods in accordance with AACE 29R-03.
  • Three forensic delay methods: TIA, Windows, As-Planned vs As-Built
  • Per-window narrative with concurrent delay assessment
  • Entitlement summary ready for submission to Employer
  • AACE 29R-03 aligned — accepted by major contract forms
View example

All examples use fictional project data. No real schedule data is used or stored.

Ready to analyse your schedule?

Upload your P6 or MSP file. Results in seconds.

No install. No commitment. Your schedule never leaves your browser until you choose to analyse it.